Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46273 REL 14: 1988-053-03 EXP PARKDALE NOAA COMPARATIVE HATCHERY STUDY
Project Number:
Title:
Hood River Production Program Monitoring and Evaluation (M&E)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
46273 REL 14
Contract Title:
1988-053-03 EXP PARKDALE NOAA COMPARATIVE HATCHERY STUDY
Contract Continuation:
Previous: Next:
44907: 1988-053-03 EXP PARKDALE NOAA COMPARATIVE HATCHERY STUDY
  • 46273 REL 30: 1988-053-03 EXP PARKDALE NOAA COMPARATIVE HATCHERY STUDY
Contract Status:
Closed
Contract Description:
Background

The Hood River, Oregon Salmon Production Program is co-managed by the Warm Springs Tribe (WS) and the Oregon Department of Fish and Wildlife (ODFW) for supplementation of spring Chinook salmon in the Hood River system.  The current Master Plan for the Hood River Production Program (March 5, 2008 Draft) calls for a comparative hatchery release study designed to "provide co-managers with the best available information for determining a long term biologically sound and cost effective spring Chinook salmon production strategy for the Hood River Basin that balances harvest needs with ecological considerations".  Rearing facilities, both inside and outside the basin, are being evaluated for long-term use in the Hood River spring Chinook supplementation program.  The objective of this evaluation is to conduct a multi-year (2008-2018) comparative study of Hood River spring Chinook reared at three different hatchery facilities prior to being moved to the West Fork Hood River for final acclimation and release.  The facilities include, Round Butte Hatchery/Pelton Ladder (RBH) on the Deschutes River, OR; Columbia Gorge Hatchery (CGH) a.k.a. Carson National Hatchery on the Wind River, WA; Parkdale Fish Facility (PFF) on the Hood River, OR.  There is currently limited large-scale fish rearing capacity at PFF and all juvenile rearing for the Hood River program is currently conducted out of basin at RBH.  The CGH hatchery provides another potential out of basin, but more geographically localized, large scale rearing facility for this program.  Each year, starting Fall 2008, returning adults will be collected in the Hood River, artificially spawned at the PFF, and gametes will be distributed to each of the respective hatchery facilities for long term-rearing to the parr-smolt stage.   Starting in Spring 2010 uniquely tagged juveniles from each facility will be moved to the Moving Falls Acclimation Pond on the West Fork Hood River for acclimation and forced release in April.  The Hood River Master Plan calls for monitoring fish health, size at release, specific growth rates, rates of precocious male maturation (age-2 minijacks, age-3 jacks) and ultimately smolt-to-adult returns (SAR's) for each brood year/release group.  SAR's for all adult year classes from all brood years will be available starting in 2013 with final returns in 2018.   These data will be used to evaluate which hatchery facility/regime is optimum for future long-term implementation in the Hood River Supplementation program.

As part of the broader Revised Hood River Production Master Plan we will conduct the following Hood River Smolt Quality Monitoring and Evaluation Study.  The overall goals will be:

A.  Monitor spring growth and smolt development at all rearing sites.

B.  Provide comparative metrics of smolt quality between rearing sites.

Specifically, we will determine if differences in growth, smolt development and early male maturation, exist between Hood River spring Chinook salmon reared at RBH, PFF and CGH and subsequently released into the West Fork Hood River for three consecutive brood years (BY) 2008-2010 released in years 2010-2012. In addition, we will monitor Deschutes stock spring Chinook reared at RBH and released into the Deschutes River and Carson stock spring Chinook reared at CGH and released into the Wind River.  These measures will allow us to:

C.  Assess the effects on growth and smolt development of transferring fish from out of basin rearing facilities (RBH and CGH) to the acclimation release site at Moving Falls on the West Fork Hood River.  

These physiological/life-history indices will provide early, predictable and replicated comparative data, before the acquisition of full SAR's in 2010-2012, for evaluating the three rearing regimes.  In addition, these metrics are independent of any potential alteration in ocean conditions that can produce variation in SAR's that are unrelated to freshwater rearing.  However, once SAR's are obtained we will be able to:

D.  Correlate physiological indices of growth and smolting to SAR to evaluate key factors responsible for potential differences in survival between release groups

This will allow us to:

E.  Evaluate rearing practices with regard to A, B and C to recommend "best" rearing practices and a long term rearing strategy for the HRPP. Results will be available for managers in late-2012.  Final correlational analysis of physiological indicators with SAR's (D) will be conducted as adults return from 2012-2018.
Account Type(s):
Expense
Contract Start Date:
12/01/2010
Contract End Date:
11/30/2011
Current Contract Value:
$181,363
Expenditures:
$181,363

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance B: 165. BPA environmental compliance 12/02/2010 12/02/2010
HRPP smolt quality monitoring C: 157. Comparative smolt quality monitoring 10/28/2011 10/28/2011
Analyze smolt quality data D: 162. Analyze smolt quality data 11/30/2011 11/30/2011
FY 2011 Annual Report E: 132. Annual report for FY 2009 11/30/2011 11/30/2011
Administration of BPA contract and coordination with CTWS F: 119. Administration of BPA contract 09/10/2011 09/10/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 12/01/2010
B 165 BPA environmental compliance 12/01/2010
C 157 Comparative smolt quality monitoring 12/01/2010
D 162 Analyze smolt quality data 12/01/2010
E 132 Annual report for FY 2009 12/01/2010
F 119 Administration of BPA contract 12/01/2010